Checking Mill Test Certificates and Heat Numbers When Tubes Arrive
Before accepting a tube delivery, confirm that every heat number on the tubes, bundle tags and packing list appears on a mill test certificate (MTC) of the type your order requires, that each MTC matches the order’s specification, grade, size and tests, and that the number of tubes per heat adds up to the packing list and the order.
This checklist is written for receiving inspectors, stores and QA staff at fabricators and plants receiving boiler, heat exchanger, carbon steel, alloy and stainless steel tubes. It complements our quality and inspection process and the tube export packing checklist.

Which Documents Should You Have Before the Delivery Arrives?
Step 1: Check Each MTC Against the Purchase Order
Step 2: Check the Marking on the Tubes and Bundle Tags
Tube marking follows the product specification and its general requirements specification: ASTM A450 for carbon and alloy steel tubes such as SA179 and SA214, and ASTM A1016 for ferritic alloy and stainless tubes such as A213.
Stencil marking on a tube showing specification, size and heat number
Bundle tag on small-OD tubes with heat number
Heat number on a tube next to the matching MTC (redacted)
Step 3: Reconcile Tube Count and Length Heat by Heat
List every heat found on the delivery and check that it has a certificate and that the count adds up. The grey row is a filled-in example.
Worked Example: 400 SA179 Tubes from Three Heats
Illustrative example
An order for 400 tubes, ASME SA-179, 19.05 mm OD × 2.11 mm minimum wall × 6,096 mm, arrives in four bundles. The packing list shows three heats; two MTCs came with the shipment.
Illustrative certificate extract – not a real certificate. Fictional mill, numbers and values.
Bundles 1 to 3 can be released (with the short count noted). Bundle 4 stays in quarantine, tagged “hold – no MTC”, until a valid certificate for heat H2601C is received and reviewed. Nothing from bundle 4 is cut, bent or issued in the meantime.
Common Mismatches and How to Resolve Them
When Should You Hold Material and Report It?
Printable Tube Receiving Checklist
Want documents before dispatch? Ask for a heat-wise packing list and the MTCs with your order to kamlesh@dineshtube-india.com, call or WhatsApp +91 83559 10913, or send an enquiry. We supply heat exchanger tubes, boiler tubes, alloy steel tubes and stainless steel tubes with EN 10204 3.1 certificates.
Tube Receiving Inspection: FAQs
What is the most important check when receiving tubes?
That every heat number on the tubes, bundle tags and packing list appears on a mill test certificate (MTC) of the type your order requires, and that the MTC shows the correct specification, grade, size and test results. A tube whose heat number is not on any certificate cannot be traced and should be held until the certificate is supplied.
Are small tubes marked individually?
The product specifications allow small tubes to be marked on a tag attached to each bundle instead of on every tube; for example ASTM A450 and A1016 give a size below which bundle-tag marking is acceptable. In that case keep the bundle tags with the tubes until the tubes are issued, and transfer the heat number to the tubes or to your traveller if the bundle is split.
What is the difference between EN 10204 3.1 and 3.2?
A 3.1 inspection certificate is issued by the manufacturer’s authorised inspection representative, independent of production, with actual test results for the delivered heat or lot. A 3.2 certificate is additionally validated by the purchaser’s inspector or an inspector named in the regulations. If the order calls for 3.2, a 3.1 certificate alone is not acceptable. See our quality and inspection process.
One heat number has several lots on the MTC. Is that a problem?
No. One heat can be processed in several heat-treatment or test lots, and the MTC may report results for each. Check that the lot or batch on the tube marking or bundle tag, if shown, matches a lot on the certificate.
What should I do if the count for a heat does not match the packing list?
Recount the bundle, record the difference by heat and bundle number, photograph the bundle tag, and tell the supplier before issuing material. A short or over count is a commercial issue; a heat that is not on any MTC is a traceability issue and the tubes should be quarantined.
Can PMI replace the MTC?
No. Positive material identification (PMI) confirms the alloy family and main elements on the tube, which is useful at receipt, but it does not replace the mill certificate. It does not report carbon for most handheld instruments, or mechanical properties, heat treatment or the other tests the specification requires.
How quickly should receiving problems be reported?
Report as soon as the mismatch is found and before the tubes are cut, bent or installed. For deliveries from us, send the photos, heat and bundle numbers and purchase order number within 7 days of delivery so we can resolve it with the mill.